Sprint Update 4/9/2017

(This column is posted at www.StevenSavage.com, www.SeventhSanctum.com, and Steve’s Tumblr)

And as promised weekly updates, or “standups” on the projects I’m working on since I’m planning more  Scrum style and loved Failbetter’s use of Scrum-style updates.

So what have I done the last week?

  • Got the Color Generator to final beta.  It’s basically ready to go, so I’ll check feedback, give it one more look-over, and call it done.  I’ve learned a lot about language working on this one, lessons that’ll pay off in later generators.
  • Way With Worlds Minibook #1: Is off to the editor.  Unfortunately she has family visiting and broke a finger, but expects to be typing-worthy next week.  I had no plans to use the edits until later anyway, so it won’t throw my plans off.
  • Way With Worlds Minibook #5: I’m writing questions at my planned pace.
  • Seventh Sanctum Spotlight: My plans to start promoting talent on the Sanctum are figured out, so I need to line up candidates soon – I’ve got a list.
  • General: Also went to two meetups on writing and project management on top of some gaming.  I think this new planning method is working out!

What am I going to do this week:

  • Finish the Color Generator: I’ll integrate any feedback, do a final check, and consider it done.
  • Way With Worlds Minibook #5: I’ll be writing more of this!
  • General: Another professional event this week, gearing up to purchase a new laptop, some chores, and possibly cleaning a closet (you know those boxes you never unpack until years after moving?).

Challenges and blockers:

  • No direct blockers, but I do have a concern about how to pace final edits on the Minibooks.  My default plan is essentially do a final edit early in the month they’re released, but I wonder if that’d just become a drag and I should do them all at once.  My gut take is I should do this, though I might have to up my writing pace – and really, that does sound like it’d turn into a drag.

– Steve

(This column is posted at www.StevenSavage.com, www.SeventhSanctum.com, and Steve’s Tumblr)

The Color Generator is coming along nicely. Check these out!
http://www.seventhsanctum.com/generate.php?Genname=color

  • Rentehiem – The oldest blue. Under light of this color gold tarnishes.
  • Osochawn – The yellow of gold. Those that see this color go insane.
  • Enklu – The yellow of gold that you will one day see.
  • Stast – The orange of a sunrise. Those that see this color become sane.
  • Pigurmote – A bold greenish-blue. The color of old dreams.
  • Tefrou – The orange of a sunrise. Paintings using this color stop envy.
  • Ichre – The orange of imaginary fires.
  • Ouwath – The purple of disgust and of the evening sky that can never be imagined.
  • Detingat – A fiery yellow. The color of clothing once worn by witches, but that changed because of a prophecy.
  • Saffican – The orange of unknown sunrises.

– Steve

April Sprint – What’s Coming up!

(This column is posted at www.StevenSavage.com, www.SeventhSanctum.com, and Steve’s Tumblr)

I’ve been thinking of how I organize my projects and share them with you my audience and friends.  I’ve not been thrilled with how I’ve done updates, and recent spates of illness and surprises derailed a few things.  So what I’m doing is taking my projects to be managed much more traditional Scrum style.  I got the idea here from Failbetter’s use of Agile to make them publicly engaged via blogposts while doing Sunless Skies.

If you’re not familiar with Scrum,, its basically a method of organization where you A) keep a backlog of stuff to do B) do it in small increments called sprints, and C) regularly report and measure progress.  I recommend reading up on it.

(I’m still big on the Getting Things Done method, and will use it as part of my work, but my large amount of longer-term projects require some different approaches plus this lets me try out techniques from work.)

What this means for you is

  1. Every month (a “sprint”) I’ll tell you what I’m planning to tackle on my projects.  Most Sprints are two weeks, but I plan my projects quarterly/monthly so this is a bit easier.
  2. I’ll do weekly reports (a sort of Standup) on progress. These are usually daily in proper Scrum, but I have my limits.
  3. I’ll do a roundup/retrospective at the end.

So what’s up for April!

Finishing The Color Generator: I’ll finish the Color Generator in April with the goal of deploying before the end of the Month – preferably mid-month.  I’ll be regularly updating it with new data so keep an eye out.

New Seventh Sanctum Spotlight: A new Seventh Sanctum project to spotlight talent and interesting media – this is an experiment and may or may not succeed.

Way With Worlds Minibooks #1: The followups to Way With Worlds.  I will send this to editor – remember these don’t launch until June.

Way With Worlds Minibook #5: Get this to at least 60% completion if not more.  And, yes I have four of these suckers written already – make room in your summer reading!

There are also some marketing efforts, tech purchases, and home maintenance but I don’t think you care about those.

So I’ll be posting updates weekly (probably Monday) to let you know where everything is once a week!

And as it’s Sunday, let’s get to a status!

What I’ve worked on:

  • Wrote 5 more questions on Minibook 5.
  • Minibook #1 will be in the hands of the editor next week.
  • Reached out to initial “promotables” for the Sanctum Spotlight and designed how it’ll run.  It’s pretty much ready to go, I’ll start it later this month.
  • A few notes on the Color Generator are in place, I’ll dive into that more soon.

What’s coming up this week:

  • I plan to focus on the Color Generator to get as much done as possible.
  • I’ll be attending two professional events, so that consumes time.

 

– Steve